Foundation settlement correction|Fixing the waste material layer to a hard layer with steel pipe pile driving!
Fundamental solution to uneven strata and settlement of fabric foundations caused by waste materials through the pressing of steel pipe piles. Prevents re-settlement by reaching a hard support layer under the weight of the building.
Difficult-to-detect buried waste materials and irregular old embankment layers in ground surveys are the main causes of localized subsidence and diagonal cracks in strip foundations, which cannot be addressed by surface improvement alone. Geotech identifies the causes through excavation verification and applies a steel pipe pile driving method that uses the building's own weight as a reaction force. A hydraulic jack penetrates the obstacle layer with a small-diameter steel pipe, reaching the hard supporting ground at depth. The subsided foundation is jacked up and returned to a level position, and high-adhesion epoxy resin is injected into the cracks. Ground fissures and voids under the floor are densely filled with air-entrained mortar (air milk) to enhance bearing capacity from the bottom. This approach achieves a fundamental solution to irregular subsidence with minimal disruption to residents and a short construction period.
- Company:ジオテック
- Price:Other